methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of Cost of Delay with its method-specific working model.
Delivery
Cost of Delay
Paper illustration of a calibrated five-by-five risk matrix with response cards.
Decision Making
Risk Matrix
Paper illustration for Trade-off Analysis.
Decision Making
Trade-off Analysis
Paper illustration for Constraint Analysis.
Decision Making
Constraint Analysis
Purposedifferent
Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence.When a project faces many possible disruptions, it quickly becomes unclear which risks deserve attention first. It separates options, evaluation criteria, and open risks. The result is captured as a Risk Matrix and a Top Risk List.With limited resources, quality, speed, cost, and risk almost always compete with each other. Trade-off Analysis makes these tensions explicit and prevents decisions from producing hidden side effects.When an initiative stalls, the limit often lies not in the idea but in hard or soft boundary conditions. Constraint Analysis separates these limits and shows which of them can actually be shaped.
Complexitydifferent
HighLowMediumLow
Timedifferent
90-180 min30-60 min45-120 min30-90 min
Participantsdifferent
3-83-102-82-8
Formatdifferent
WorkshopWorkshop + asyncWorkshop + asyncWorkshop + async
Outputdifferent
CoD Table, Prioritization SequenceRisk Matrix, Top Risk ListTrade-off Matrix, Criteria List, Decision Rationale, Accepted DownsidesConstraint List, Hard/Soft Classification, Option Impact Notes, Decision Boundaries
Tags1 shared
PrioritizationDeliveryEconomicsDecision
RiskDecisionPrioritizationAssessment
TradeoffsDecisionCriteriaOptions
ConstraintsDecisionPlanningOptions
Add more methods