methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of Cost of Delay with its method-specific working model.
Delivery
Cost of Delay
Paper illustration of a calibrated five-by-five risk matrix with response cards.
Decision Making
Risk Matrix
Paper illustration for Fault Tree Analysis.
Operations
Fault Tree Analysis
Paper illustration of Barrier Analysis with its method-specific working model.
Operations
Barrier Analysis
Purposedifferent
Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence.When a project faces many possible disruptions, it quickly becomes unclear which risks deserve attention first. It separates options, evaluation criteria, and open risks. The result is captured as a Risk Matrix and a Top Risk List.For a critical top event with several possible triggers, the method logically models failure paths. It makes visible which combinations of conditions can lead to damage.For a risk that can only be managed through multiple layers of protection, the method examines the effectiveness of each barrier. It shows where safeguards are missing, too weak, or fail under real conditions.
Complexitydifferent
HighLowHighMedium
Timedifferent
90-180 min30-60 min2-6 h2-4 h
Participantsdifferent
3-83-103-82-6
Formatdifferent
WorkshopWorkshop + asyncWorkshop + asyncWorkshop + async
Outputdifferent
CoD Table, Prioritization SequenceRisk Matrix, Top Risk ListFault Tree, Critical Paths, Cause Hypotheses, Control ActionsBarrier Inventory, Failure Analysis per Barrier, Action Backlog
Tagsno overlap
PrioritizationDeliveryEconomicsDecision
RiskDecisionPrioritizationAssessment
RiskRoot causeSafety
Root causeSafetyIncident
Add more methods