methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of Cost of Delay with its method-specific working model.
Delivery
Cost of Delay
Paper illustration of a calibrated five-by-five risk matrix with response cards.
Decision Making
Risk Matrix
Paper illustration for Change Analysis.
Operations
Change Analysis
Paper illustration for Fault Tree Analysis.
Operations
Fault Tree Analysis
Purposedifferent
Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence.When a project faces many possible disruptions, it quickly becomes unclear which risks deserve attention first. It separates options, evaluation criteria, and open risks. The result is captured as a Risk Matrix and a Top Risk List.For a deviation after a change, the method isolates the influence of the altered condition. It narrows down which differences are relevant and which are just accompanying noise.For a critical top event with several possible triggers, the method logically models failure paths. It makes visible which combinations of conditions can lead to damage.
Complexitydifferent
HighLowMediumHigh
Timedifferent
90-180 min30-60 min45-120 min2-6 h
Participantsdifferent
3-83-102-63-8
Formatdifferent
WorkshopWorkshop + asyncWorkshop + asyncWorkshop + async
Outputdifferent
CoD Table, Prioritization SequenceRisk Matrix, Top Risk ListChange Matrix, Cause Hypotheses, Validation Questions, Action ListFault Tree, Critical Paths, Cause Hypotheses, Control Actions
Tagsno overlap
PrioritizationDeliveryEconomicsDecision
RiskDecisionPrioritizationAssessment
ChangeRoot causeTroubleshootingComparison
RiskRoot causeSafety
Add more methods