View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of Cost of Delay with its method-specific working model.
Delivery
Cost of Delay
A hypothetical failure makes concrete risks, signals, and fitting mitigations visible.
Decision Making
Pre-Mortem
Paper illustration for Smoke Test.
Product Discovery
Smoke Test
Paper illustration of a calm four-quadrant Assumption Map with hypothesis cards and emphasis on important assumptions with little evidence.
Product Discovery
Assumption Mapping
Purposedifferent
Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence.In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures.When demand only needs to be roughly verified, it tests interest with minimal effort. It measures whether people would take a next step at all.When assumptions still sit unordered in the room, it weighs uncertainty against leverage. It makes visible which hypotheses should be checked first.
Complexitydifferent
HighLowLowMedium
Timedifferent
90-180 min20–45 min1-5 Tage45-60 min
Participantsdifferent
3-8Small cross-functional groupNutzertraffic2-8
Formatdifferent
WorkshopWorkshopAsyncWorkshop + async
Outputdifferent
CoD Table, Prioritization SequenceRisk list, Mitigation plan, Assumption logInterest Metrics, Conversion Signal, Learning NoteAssumption map, Test backlog, Risk ranking
Tagsno overlap
PrioritizationDeliveryEconomicsDecision
RiskDecisionFailurePlanning
ValidationExperimentsDemandGrowth
AssumptionsRiskExperimentsValidation
Add more methods