methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of Cost of Delay with its method-specific working model.
Delivery
Cost of Delay
Paper illustration for Future Reality Tree.
Systems Thinking
Future Reality Tree
Paper illustration for Evaporating Cloud.
Systems Thinking
Evaporating Cloud
Paper illustration of DIBB with its method-specific working model.
Product Strategy
DIBB
Purposedifferent
Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence.A Future Reality Tree shows how desired actions are meant to lead to a better system state. The method checks whether a path of change holds together logically before time flows into implementation.The method makes visible why two seemingly incompatible demands arise and which assumption must be tested to resolve the conflict.DIBB helps clarify target groups, value, goals, and priorities by making the logic behind a decision explicit. It captures results as a DIBB document, belief list, bet list, and learning report.
Complexitydifferent
HighHighMediumLow
Timedifferent
90-180 min2-4 h60-120 min1-2 h
Participantsdifferent
3-83-82-82-8
Formatdifferent
WorkshopWorkshopWorkshopWorkshop + async
Outputdifferent
CoD Table, Prioritization SequenceFuture Reality Tree, Negative Branches, Assumption List, Improved InjectionsConflict Cloud, Assumption List, Breakthrough Ideas, Next ExperimentsDIBB document, Belief list, Bet list, Learning report
Tagsno overlap
PrioritizationDeliveryEconomicsDecision
Theory of ConstraintsSystems thinkingChange
Theory of ConstraintsAssumptionsSystems thinking
StrategyDecisionAssumptionsHypothesis
Add more methods