methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of Cost of Delay with its method-specific working model.
Delivery
Cost of Delay
Paper illustration for Future Reality Tree.
Systems Thinking
Future Reality Tree
Paper illustration of DIBB with its method-specific working model.
Product Strategy
DIBB
Paper illustration of Leverage Points with its method-specific working model.
Systems Thinking
Leverage Points
Purposedifferent
Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence.A Future Reality Tree shows how desired actions are meant to lead to a better system state. The method checks whether a path of change holds together logically before time flows into implementation.DIBB helps clarify target groups, value, goals, and priorities by making the logic behind a decision explicit. It captures results as a DIBB document, belief list, bet list, and learning report.Leverage Points show exactly where interventions in a system produce a disproportionate effect. It draws relationships, patterns, and feedback loops. The result is captured as a leverage map and action strategy.
Complexitydifferent
HighHighLowHigh
Timedifferent
90-180 min2-4 h1-2 hHalf day
Participantsdifferent
3-83-82-83-12
Formatdifferent
WorkshopWorkshopWorkshop + asyncWorkshop
Outputdifferent
CoD Table, Prioritization SequenceFuture Reality Tree, Negative Branches, Assumption List, Improved InjectionsDIBB document, Belief list, Bet list, Learning reportLeverage Map, Action Strategy
Tagsno overlap
PrioritizationDeliveryEconomicsDecision
Theory of ConstraintsSystems thinkingChange
StrategyDecisionAssumptionsHypothesis
Systems thinkingChangeStrategy
Add more methods