Criterion
Paper illustration of Cost of Delay with its method-specific working model.
Delivery
Cost of Delay
Paper illustration for Fake Door Test
Product Discovery
Fake Door Test
Paper illustration of Riskiest Assumption Test with a method-specific labelled workspace.
Product Discovery
Riskiest Assumption Test
Paper illustration of a calm four-quadrant Assumption Map with hypothesis cards and emphasis on important assumptions with little evidence.
Product Discovery
Assumption Mapping
Purposedifferent
Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence.When demand is still unclear, it measures interest in a feature before it is built. It separates real behavior from polite agreement and deliberately keeps build effort small.When an idea hinges on one critical unknown, it prioritizes testing that exact piece of uncertainty first. It separates problem, assumption, solution, and evidence. The result is captured as a prioritized list of assumptions, a test plan, and a result report.When assumptions still sit unordered in the room, it weighs uncertainty against leverage. It makes visible which hypotheses should be checked first.
Complexitydifferent
HighMediumMediumMedium
Timedifferent
90-180 min1-5 Tage1-2 Wochen pro Iteration45-60 min
Participantsdifferent
3-8Nutzertraffic2-62-8
Formatdifferent
WorkshopAsyncWorkshop + asyncWorkshop + async
Outputdifferent
CoD Table, Prioritization SequenceClick Data, Interest Signal, Learning DecisionPrioritized Assumption List, Test Plan, Results ReportAssumption map, Test backlog, Risk ranking
Tagsno overlap
PrioritizationDeliveryEconomicsDecision
ValidationExperimentsDemandDiscovery
ExperimentsValidationDiscoveryAssumptions
AssumptionsRiskExperimentsValidation
Add more methods