Criterion
Paper illustration of Cost of Delay with its method-specific working model.
Delivery
Cost of Delay
Paper illustration of DIBB with its method-specific working model.
Product Strategy
DIBB
A hypothetical failure makes concrete risks, signals, and fitting mitigations visible.
Decision Making
Pre-Mortem
Paper illustration of a calm four-quadrant Assumption Map with hypothesis cards and emphasis on important assumptions with little evidence.
Product Discovery
Assumption Mapping
Purposedifferent
Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence.DIBB helps clarify target groups, value, goals, and priorities by making the logic behind a decision explicit. It captures results as a DIBB document, belief list, bet list, and learning report.In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures.When assumptions still sit unordered in the room, it weighs uncertainty against leverage. It makes visible which hypotheses should be checked first.
Complexitydifferent
HighLowLowMedium
Timedifferent
90-180 min1-2 h20–45 min45-60 min
Participantsdifferent
3-82-8Small cross-functional group2-8
Formatdifferent
WorkshopWorkshop + asyncWorkshopWorkshop + async
Outputdifferent
CoD Table, Prioritization SequenceDIBB document, Belief list, Bet list, Learning reportRisk list, Mitigation plan, Assumption logAssumption map, Test backlog, Risk ranking
Tagsno overlap
PrioritizationDeliveryEconomicsDecision
StrategyDecisionAssumptionsHypothesis
RiskDecisionFailurePlanning
AssumptionsRiskExperimentsValidation