methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of Cost of Delay with its method-specific working model.
Delivery
Cost of Delay
Paper illustration of Barrier Analysis with its method-specific working model.
Operations
Barrier Analysis
Paper illustration of an assumption matrix with prioritized test cards
Decision Making
Assumption Surfacing
A 5 Whys working surface connects an observable problem with evidenced causes, marked uncertainty and concrete countermeasures with ownership.
Operations
5 Whys
Purposedifferent
Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence.For a risk that can only be managed through multiple layers of protection, the method examines the effectiveness of each barrier. It shows where safeguards are missing, too weak, or fail under real conditions.Plans often contain assumptions that were never openly stated and remain dangerous precisely because of that. Assumption Surfacing makes these silent premises visible and prioritizes which of them carry the initiative or could sink it.For a single, hard-to-explain deviation, the method exposes the causal chain behind the visible symptom. It keeps the cause open until a controllable condition emerges instead of a mere description.
Complexitydifferent
HighMediumLowLow
Timedifferent
90-180 min2-4 h45-90 min15-30 min
Participantsdifferent
3-82-62-82-6
Formatdifferent
WorkshopWorkshop + asyncWorkshop + asyncWorkshop
Outputdifferent
CoD Table, Prioritization SequenceBarrier Inventory, Failure Analysis per Barrier, Action BacklogAssumption List, Critical Assumptions, Learning PlanRoot cause notes, Countermeasures
Tagsno overlap
PrioritizationDeliveryEconomicsDecision
Root causeSafetyIncident
AssumptionsRiskDecisionDiscovery
Root causeIncidentLeanProblem solving
Add more methods