methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of Cost of Delay with its method-specific working model.
Delivery
Cost of Delay
Paper illustration: scenarios and architectural decisions are connected to identified risks.
Architecture
ATAM (Architecture Tradeoff Analysis Method)
Paper illustration of an assumption matrix with prioritized test cards
Decision Making
Assumption Surfacing
Paper illustration of a calm four-quadrant Assumption Map with hypothesis cards and emphasis on important assumptions with little evidence.
Product Discovery
Assumption Mapping
Purposedifferent
Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence.ATAM helps teams weigh architecture decisions when quality goals compete. The team considers business goals, stakeholder expectations, and technical decisions together. The evaluation shows which risks need further investigation.Plans often contain assumptions that were never openly stated and remain dangerous precisely because of that. Assumption Surfacing makes these silent premises visible and prioritizes which of them carry the initiative or could sink it.When assumptions still sit unordered in the room, it weighs uncertainty against leverage. It makes visible which hypotheses should be checked first.
Complexitydifferent
HighHighLowMedium
Timedifferent
90-180 minSeveral meetings plus preparation and analysis; total effort depends on scope45-90 min45-60 min
Participantsdifferent
3-8Evaluation team, architects, and relevant stakeholders2-82-8
Formatdifferent
WorkshopWorkshop + asyncWorkshop + asyncWorkshop + async
Outputdifferent
CoD Table, Prioritization SequencePrioritized quality scenarios in a utility tree, Architecture risks with reasoning and assumptions, Sensitivity and trade-off points, Findings report with open investigationsAssumption List, Critical Assumptions, Learning PlanAssumption map, Test backlog, Risk ranking
Tagsno overlap
PrioritizationDeliveryEconomicsDecision
ArchitectureQualityRiskTradeoffsStakeholders
AssumptionsRiskDecisionDiscovery
AssumptionsRiskExperimentsValidation
Add more methods