methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of Cost of Delay with its method-specific working model.
Delivery
Cost of Delay
Paper illustration of an assumption matrix with prioritized test cards
Decision Making
Assumption Surfacing
Paper illustration for Failure Mode and Effects Analysis
Operations
Failure Mode and Effects Analysis
Paper illustration for Kepner-Tregoe
Operations
Kepner-Tregoe
Purposedifferent
Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence.Plans often contain assumptions that were never openly stated and remain dangerous precisely because of that. Assumption Surfacing makes these silent premises visible and prioritizes which of them carry the initiative or could sink it.For a process, product, or service with noticeable failure risks, the method assesses possible failure modes in advance. It directs attention to combinations of occurrence, effect, and detectability.For a disturbance that's hard to pin down, the method cleanly separates problem, cause, and decision. It reduces mixing when symptoms allow several interpretations.
Complexitydifferent
HighLowHighHigh
Timedifferent
90-180 min45-90 min2-6 h2-8 h
Participantsdifferent
3-82-83-102-8
Formatdifferent
WorkshopWorkshop + asyncWorkshopWorkshop + async
Outputdifferent
CoD Table, Prioritization SequenceAssumption List, Critical Assumptions, Learning PlanFMEA Table, Risk Priority, Mitigation ActionsProblem Analysis, Decision Analysis, Risk Plan
Tagsno overlap
PrioritizationDeliveryEconomicsDecision
AssumptionsRiskDecisionDiscovery
RiskQualityOperationsRoot cause
Problem solvingRoot causeDecisionOperations
Add more methods