methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of Cost of Delay with its method-specific working model.
Delivery
Cost of Delay
Paper illustration of an assumption matrix with prioritized test cards
Decision Making
Assumption Surfacing
A paper-based illustration representing arc42 with its core stages and visible working result.
Architecture
arc42
Paper illustration of a calibrated five-by-five risk matrix with response cards.
Decision Making
Risk Matrix
Purposedifferent
Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence.Plans often contain assumptions that were never openly stated and remain dangerous precisely because of that. Assumption Surfacing makes these silent premises visible and prioritizes which of them carry the initiative or could sink it.arc42 structures architecture knowledge so teams can document system, decisions, and risks consistently. The template builds a living understanding of the architecture instead of scattered notes.When a project faces many possible disruptions, it quickly becomes unclear which risks deserve attention first. It separates options, evaluation criteria, and open risks. The result is captured as a Risk Matrix and a Top Risk List.
Complexitydifferent
HighLowLowLow
Timedifferent
90-180 min45-90 min1-2 Tage30-60 min
Participantsdifferent
3-82-81-43-10
Formatdifferent
WorkshopWorkshop + asyncWorkshop + asyncWorkshop + async
Outputdifferent
CoD Table, Prioritization SequenceAssumption List, Critical Assumptions, Learning PlanArchitecture Document, Context View, Runtime View, Deployment ViewRisk Matrix, Top Risk List
Tagsno overlap
PrioritizationDeliveryEconomicsDecision
AssumptionsRiskDecisionDiscovery
ArchitectureDocumentationCommunication
RiskDecisionPrioritizationAssessment
Add more methods