View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Delivery Cost of Delay | ![]() Architecture ARID (Active Reviews for Intermediate Designs) | ![]() Architecture Risk Storming | ![]() Decision Making Risk Matrix |
|---|---|---|---|---|
Purposedifferent | Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence. | ARID examines how well developers can work with a technical design. It focuses on a part of the system that can still be revised, between the architecture overview and the detailed specification. | Helps clarify architecture context, options, and consequences in concrete terms. It organizes technical context, alternatives, and consequences. The result is captured as an Annotated Diagram, a Prioritized Risk List, and an Action Backlog. | When a project faces many possible disruptions, it quickly becomes unclear which risks deserve attention first. It separates options, evaluation criteria, and open risks. The result is captured as a Risk Matrix and a Top Risk List. |
Complexitydifferent | High | Medium | Low | Low |
Timedifferent | 90-180 min | 2–4 h review as a planning range; preparation and evaluation additional | 60-90 min | 30-60 min |
Participantsdifferent | 3-8 | Designers, developers as users, and facilitation | 4-12 | 3-10 |
Formatdifferent | Workshop | Workshop + async | Workshop | Workshop + async |
Outputdifferent | CoD Table, Prioritization Sequence | Prioritized development tasks, Jointly produced code or pseudocode, Observed difficulties and open design questions, Proposed design revisions | Annotated Diagram, Prioritized Risk List, Action Backlog | Risk Matrix, Top Risk List |
Tagsno overlap | PrioritizationDeliveryEconomicsDecision | ArchitectureEngineeringFeedbackValidationTasks | RiskArchitectureWorkshopValidation | RiskDecisionPrioritizationAssessment |



