methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of Cost of Delay with its method-specific working model.
Delivery
Cost of Delay
A paper-based illustration representing arc42 with its core stages and visible working result.
Architecture
arc42
Paper illustration of an assumption matrix with prioritized test cards
Decision Making
Assumption Surfacing
Paper illustration of two considered options leading to a decision record with a marked status and visible consequences.
Architecture
Architecture Decision Record
Purposedifferent
Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence.arc42 structures architecture knowledge so teams can document system, decisions, and risks consistently. The template builds a living understanding of the architecture instead of scattered notes.Plans often contain assumptions that were never openly stated and remain dangerous precisely because of that. Assumption Surfacing makes these silent premises visible and prioritizes which of them carry the initiative or could sink it.An ADR permanently records an architecture decision with context, trade-offs, and consequence. It creates continuity for later changes because the decision path stays traceable.
Complexitydifferent
HighLowLowLow
Timedifferent
90-180 min1-2 Tage45-90 min15-45 min
Participantsdifferent
3-81-42-81-3
Formatdifferent
WorkshopWorkshop + asyncWorkshop + asyncAsync
Outputdifferent
CoD Table, Prioritization SequenceArchitecture Document, Context View, Runtime View, Deployment ViewAssumption List, Critical Assumptions, Learning PlanADR File, Decision Log, Rationale
Tagsno overlap
PrioritizationDeliveryEconomicsDecision
ArchitectureDocumentationCommunication
AssumptionsRiskDecisionDiscovery
ArchitectureRationaleDocumentationGovernance
Add more methods