methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of Cost of Delay with its method-specific working model.
Delivery
Cost of Delay
Paper illustration for ABC Analysis
Operations
ABC Analysis
Paper illustration: scenarios and architectural decisions are connected to identified risks.
Architecture
ATAM (Architecture Tradeoff Analysis Method)
Paper illustration for Failure Mode and Effects Analysis
Operations
Failure Mode and Effects Analysis
Purposedifferent
Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence.With many similar objects of differing economic significance, the method prioritizes effort by effect. It separates what needs regular steering from what rarely needs attention.ATAM helps teams weigh architecture decisions when quality goals compete. The team considers business goals, stakeholder expectations, and technical decisions together. The evaluation shows which risks need further investigation.For a process, product, or service with noticeable failure risks, the method assesses possible failure modes in advance. It directs attention to combinations of occurrence, effect, and detectability.
Complexitydifferent
HighLowHighHigh
Timedifferent
90-180 min30-60 minSeveral meetings plus preparation and analysis; total effort depends on scope2-6 h
Participantsdifferent
3-81-5Evaluation team, architects, and relevant stakeholders3-10
Formatdifferent
WorkshopAsyncWorkshop + asyncWorkshop
Outputdifferent
CoD Table, Prioritization SequenceABC Classification, Focus Rules, Control ListPrioritized quality scenarios in a utility tree, Architecture risks with reasoning and assumptions, Sensitivity and trade-off points, Findings report with open investigationsFMEA Table, Risk Priority, Mitigation Actions
Tagsno overlap
PrioritizationDeliveryEconomicsDecision
PrioritizationOperationsPortfolio
ArchitectureQualityRiskTradeoffsStakeholders
RiskQualityOperationsRoot cause
Add more methods