Paper illustration of Cost of Delay with its method-specific working model.
Delivery
Cost of Delay
Paper illustration for ABC Analysis
Operations
ABC Analysis
A 5 Whys working surface connects an observable problem with evidenced causes, marked uncertainty and concrete countermeasures with ownership.
Operations
5 Whys
Paper illustration for Kepner-Tregoe
Operations
Kepner-Tregoe
Purposedifferent
Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence.With many similar objects of differing economic significance, the method prioritizes effort by effect. It separates what needs regular steering from what rarely needs attention.For a single, hard-to-explain deviation, the method exposes the causal chain behind the visible symptom. It keeps the cause open until a controllable condition emerges instead of a mere description.For a disturbance that's hard to pin down, the method cleanly separates problem, cause, and decision. It reduces mixing when symptoms allow several interpretations.
Complexitydifferent
HighLowLowHigh
Timedifferent
90-180 min30-60 min15-30 min2-8 h
Participantsdifferent
3-81-52-62-8
Formatdifferent
WorkshopAsyncWorkshopWorkshop + async
Outputdifferent
CoD Table, Prioritization SequenceABC Classification, Focus Rules, Control ListRoot cause notes, CountermeasuresProblem Analysis, Decision Analysis, Risk Plan
Tagsno overlap
PrioritizationDeliveryEconomicsDecision
PrioritizationOperationsPortfolio
Root causeIncidentLeanProblem solving
Problem solvingRoot causeDecisionOperations