View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Decision Making Constraint Analysis | ![]() Product Discovery MVP Test Matrix | ![]() Product Discovery Test Card | ![]() Product Discovery Experiment Canvas |
|---|---|---|---|---|
Purposedifferent | When an initiative stalls, the limit often lies not in the idea but in hard or soft boundary conditions. Constraint Analysis separates these limits and shows which of them can actually be shaped. | When several minimal variants compete to answer the same question, it makes comparing and choosing between them cleaner. It separates problem, assumption, solution, and evidence. The result is captured as a Test Matrix and a Test Plan. | The Test Card turns a critical assumption into a testable claim and specifies in advance which result counts as success. | When experiments become unreadable after the fact, it arranges hypothesis, signal, and learning goal on a single canvas. It separates problem, assumption, solution, and evidence. The result is captured as a Completed Experiment Canvas and a Success Metric. |
Complexitydifferent | Low | Medium | Low | Low |
Timedifferent | 30-90 min | 45-75 min | 20-35 min | 30-60 min |
Participantsdifferent | 2-8 | 2-8 | 1-5 | 1-5 |
Formatdifferent | Workshop + async | Workshop | Workshop + async | Workshop + async |
Outputdifferent | Constraint List, Hard/Soft Classification, Option Impact Notes, Decision Boundaries | Test Matrix, Test Plan | Test Card with a pre-set threshold | Completed Experiment Canvas, Success Metric |
Tagsno overlap | ConstraintsDecisionPlanningOptions | ExperimentsValidationDiscoveryOptions | ExperimentsValidationDiscoveryHypothesis | ExperimentsValidationDiscoveryHypothesis |



