View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Decision Making Constraint Analysis | ![]() Delivery Cost of Delay | ![]() Product Discovery Test Card | ![]() Product Discovery Fake Door Test |
|---|---|---|---|---|
Purposedifferent | When an initiative stalls, the limit often lies not in the idea but in hard or soft boundary conditions. Constraint Analysis separates these limits and shows which of them can actually be shaped. | Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence. | The Test Card turns a critical assumption into a testable claim and specifies in advance which result counts as success. | When demand is still unclear, it measures interest in a feature before it is built. It separates real behavior from polite agreement and deliberately keeps build effort small. |
Complexitydifferent | Low | High | Low | Medium |
Timedifferent | 30-90 min | 90-180 min | 20-35 min | 1-5 Tage |
Participantsdifferent | 2-8 | 3-8 | 1-5 | Nutzertraffic |
Formatdifferent | Workshop + async | Workshop | Workshop + async | Async |
Outputdifferent | Constraint List, Hard/Soft Classification, Option Impact Notes, Decision Boundaries | CoD Table, Prioritization Sequence | Test Card with a pre-set threshold | Click Data, Interest Signal, Learning Decision |
Tagsno overlap | ConstraintsDecisionPlanningOptions | PrioritizationDeliveryEconomicsDecision | ExperimentsValidationDiscoveryHypothesis | ValidationExperimentsDemandDiscovery |



