methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Constraint Analysis.
Decision Making
Constraint Analysis
Paper illustration of Cost of Delay with its method-specific working model.
Delivery
Cost of Delay
Decision Tree method illustration showing its working structure
Decision Making
Decision Tree
A hypothetical failure makes concrete risks, signals, and fitting mitigations visible.
Decision Making
Pre-Mortem
Purposedifferent
When an initiative stalls, the limit often lies not in the idea but in hard or soft boundary conditions. Constraint Analysis separates these limits and shows which of them can actually be shaped.Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence.For decisions with follow-on paths and dependencies, a linear comparison is often not enough. A Decision Tree shows how options branch under conditions and which consequences hang on each branch.In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures.
Complexitydifferent
LowHighMediumLow
Timedifferent
30-90 min90-180 min30-90 min20–45 min
Participantsdifferent
2-83-81-6Small cross-functional group
Formatdifferent
Workshop + asyncWorkshopWorkshop + asyncWorkshop
Outputdifferent
Constraint List, Hard/Soft Classification, Option Impact Notes, Decision BoundariesCoD Table, Prioritization SequenceDecision Tree, Option Map, Assumption ListRisk list, Mitigation plan, Assumption log
Tags1 shared
ConstraintsDecisionPlanningOptions
PrioritizationDeliveryEconomicsDecision
DecisionTreeOptions
RiskDecisionFailurePlanning
Add more methods