View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Constraint Analysis.
Decision Making
Constraint Analysis
Paper illustration of Cost of Delay with its method-specific working model.
Delivery
Cost of Delay
Paper illustration of a calm four-quadrant Assumption Map with hypothesis cards and emphasis on important assumptions with little evidence.
Product Discovery
Assumption Mapping
A hypothetical failure makes concrete risks, signals, and fitting mitigations visible.
Decision Making
Pre-Mortem
Purposedifferent
When an initiative stalls, the limit often lies not in the idea but in hard or soft boundary conditions. Constraint Analysis separates these limits and shows which of them can actually be shaped.Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence.When assumptions still sit unordered in the room, it weighs uncertainty against leverage. It makes visible which hypotheses should be checked first.In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures.
Complexitydifferent
LowHighMediumLow
Timedifferent
30-90 min90-180 min45-60 min20–45 min
Participantsdifferent
2-83-82-8Small cross-functional group
Formatdifferent
Workshop + asyncWorkshopWorkshop + asyncWorkshop
Outputdifferent
Constraint List, Hard/Soft Classification, Option Impact Notes, Decision BoundariesCoD Table, Prioritization SequenceAssumption map, Test backlog, Risk rankingRisk list, Mitigation plan, Assumption log
Tagsno overlap
ConstraintsDecisionPlanningOptions
PrioritizationDeliveryEconomicsDecision
AssumptionsRiskExperimentsValidation
RiskDecisionFailurePlanning