methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Communication Plan
Delivery
Communication Plan
Paper illustration of RAID Log with a method-specific labelled workspace.
Delivery
RAID Log
A paper-based illustration representing C4 Model with its core stages and visible working result.
Architecture
C4 Model
Paper illustration of two considered options leading to a decision record with a marked status and visible consequences.
Architecture
Architecture Decision Record
Purposedifferent
When many people need to be informed in parallel and messages would otherwise arrive unevenly or too late, a Communication Plan orders communication reliably. Channels, audiences, and cadences interlock so important information doesn't get lost.Helps clarify scope, sequence, and delivery flow in concrete terms. It makes work, boundaries, and order steerable. The result is captured as a RAID Log and a source for status reporting.The C4 Model makes a system legible across several resolution levels, from context down to code. It suits situations where different audiences need to understand the same architecture from different altitudes.An ADR permanently records an architecture decision with context, trade-offs, and consequence. It creates continuity for later changes because the decision path stays traceable.
Complexitysame
LowLowLowLow
Timedifferent
45-90 min30 min Setup, dann laufend1-4 h15-45 min
Participantsdifferent
2-61-3 maintaining, briefing for everyone1-51-3
Formatdifferent
Workshop + asyncAsyncWorkshop + asyncAsync
Outputdifferent
Communication Plan, Channel Matrix, Message CadenceRAID Log, Status Report SourceContext Diagram, Container Diagram, Component DiagramADR File, Decision Log, Rationale
Tagsno overlap
CommunicationStakeholdersDeliveryPlanning
RiskTrackingStakeholdersGovernance
ArchitectureCommunicationVisualization
ArchitectureRationaleDocumentationGovernance
Add more methods