Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
ChatOps workspace showing the question, observations, and next decision.
DevOps
ChatOps
Paper illustration for Three-Point Estimation.
Decision Making
Three-Point Estimation
Game Day workspace showing the question, observations, and next decision.
DevOps
Game Day
Paper illustration for NoEstimates.
Agile
NoEstimates
Purposedifferent
For operational work in a distributed team, the method links communication with direct system control. It records decisions right where the signal, the context, and the execution come together.A single estimate for effort, time, or risk often looks too smooth for the real uncertainty behind it. It separates options, evaluation criteria, and open risks. The result is captured as a Three-Point Estimate, Risk Range, and Assumption Notes.In preparing for rare incidents, the method tests response capability under controlled conditions. It shows where assumptions about stability, roles, and recovery are too optimistic.When estimating slows a team down more than it helps, it shifts the focus to flow, small slices, and real lead time. It sorts work by value, risk, and delivery ability. The result is captured as Throughput Data, Flow Forecast, and Slicing Rules.
Complexitydifferent
MediumMediumHighMedium
Timedifferent
Ongoing10-30 min je ItemHalber Taglaufend
Participantsdifferent
2-201-85-202-12
Formatdifferent
Workshop + asyncWorkshop + asyncWorkshopWorkshop + async
Outputdifferent
Chat Transcript, Action Log, AutomationsThree-Point Estimate, Risk Range, Assumption NotesSimulation Notes, Gaps List, Updated RunbooksThroughput Data, Flow Forecast, Slicing Rules
Tagsno overlap
CollaborationEngineeringIncident
EstimationUncertaintyForecasting
ResilienceOperationsIncident
EstimationForecastingFlow