View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Change Analysis.
Operations
Change Analysis
Paper illustration for Three-Point Estimation.
Decision Making
Three-Point Estimation
Paper illustration for Alignment Mapping.
Facilitation
Alignment Mapping
Paper illustration of Power-Interest Grid with a method-specific labelled workspace.
Facilitation
Power Interest Grid
Purposedifferent
For a deviation after a change, the method isolates the influence of the altered condition. It narrows down which differences are relevant and which are just accompanying noise.A single estimate for effort, time, or risk often looks too smooth for the real uncertainty behind it. It separates options, evaluation criteria, and open risks. The result is captured as a Three-Point Estimate, Risk Range, and Assumption Notes.When several people work toward one goal but hold different mental maps, Alignment Mapping makes the discrepancies visible. It arranges goals, assumptions, and priorities so shared direction becomes verifiable.When many stakeholders compete for attention at once, the Power Interest Grid sorts them by influence and stake. It turns individual contributions into a visible selection. The result is captured as a Power Interest Grid and a stakeholder-specific strategy.
Complexitydifferent
MediumMediumMediumLow
Timedifferent
45-120 min10-30 min je Item1-2 h30-60 min
Participantsdifferent
2-61-84-122-8
Formatdifferent
Workshop + asyncWorkshop + asyncWorkshopWorkshop
Outputdifferent
Change Matrix, Cause Hypotheses, Validation Questions, Action ListThree-Point Estimate, Risk Range, Assumption NotesAlignment Map, Open Issues, Decision QuestionsPower Interest Grid, Strategy per Stakeholder
Tagsno overlap
ChangeRoot causeTroubleshootingComparison
EstimationUncertaintyForecasting
AlignmentStakeholdersStrategyFacilitation
StakeholdersFacilitationAlignmentPlanning
Add more methods