methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Change Analysis.
Operations
Change Analysis
Paper illustration for Solution Interview
Product Discovery
Solution Interview
Paper illustration for Fault Isolation.
Engineering
Fault Isolation
A paper-based illustration representing Design Sprint with its core stages and visible working result.
Innovation
Design Sprint
Purposedifferent
For a deviation after a change, the method isolates the influence of the altered condition. It narrows down which differences are relevant and which are just accompanying noise.When a solution idea is already on the table, it checks how it is understood and evaluated. It looks for resonance, objections, and missing fit early in the conversation.In technical failures, the visible symptom often gets mixed up with the actual cause. Fault Isolation narrows the fault space and progressively reduces which part of the system is truly affected.When the product question is unclear and time pressure is high, the method takes a team from an open idea to a testable solution. It connects problem understanding, decision, and learning in one compact format, lowering the risk of spending a lot of energy on a mere guess.
Complexitydifferent
MediumMediumMediumHigh
Timedifferent
45-120 min30-60 min je Interview30-180 min4-5 Tage
Participantsdifferent
2-65-10 Interviews1-65-8
Formatdifferent
Workshop + asyncWorkshop + asyncWorkshop + asyncWorkshop
Outputdifferent
Change Matrix, Cause Hypotheses, Validation Questions, Action ListSolution Feedback, Objection List, Validation NotesFault Isolation Map, Test Log, Excluded Hypotheses, Narrowed Fault AreaPrototype, Test Findings, Decision Rationale
Tagsno overlap
ChangeRoot causeTroubleshootingComparison
ValidationInterviewsPrototype
TroubleshootingDiagnosisEngineering
Design sprintPrototypeValidationInnovation
Add more methods