View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Operations Change Analysis | ![]() Operations Fault Tree Analysis | ![]() Decision Making Pre-Mortem | ![]() Operations Failure Mode and Effects Analysis |
|---|---|---|---|---|
Purposedifferent | For a deviation after a change, the method isolates the influence of the altered condition. It narrows down which differences are relevant and which are just accompanying noise. | For a critical top event with several possible triggers, the method logically models failure paths. It makes visible which combinations of conditions can lead to damage. | In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures. | For a process, product, or service with noticeable failure risks, the method assesses possible failure modes in advance. It directs attention to combinations of occurrence, effect, and detectability. |
Complexitydifferent | Medium | High | Low | High |
Timedifferent | 45-120 min | 2-6 h | 20–45 min | 2-6 h |
Participantsdifferent | 2-6 | 3-8 | Small cross-functional group | 3-10 |
Formatdifferent | Workshop + async | Workshop + async | Workshop | Workshop |
Outputdifferent | Change Matrix, Cause Hypotheses, Validation Questions, Action List | Fault Tree, Critical Paths, Cause Hypotheses, Control Actions | Risk list, Mitigation plan, Assumption log | FMEA Table, Risk Priority, Mitigation Actions |
Tagsno overlap | ChangeRoot causeTroubleshootingComparison | RiskRoot causeSafety | RiskDecisionFailurePlanning | RiskQualityOperationsRoot cause |



