View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Operations Change Analysis | ![]() Operations Fault Tree Analysis | ![]() Decision Making Pre-Mortem | ![]() Decision Making Assumption Surfacing |
|---|---|---|---|---|
Purposedifferent | For a deviation after a change, the method isolates the influence of the altered condition. It narrows down which differences are relevant and which are just accompanying noise. | For a critical top event with several possible triggers, the method logically models failure paths. It makes visible which combinations of conditions can lead to damage. | In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures. | Plans often contain assumptions that were never openly stated and remain dangerous precisely because of that. Assumption Surfacing makes these silent premises visible and prioritizes which of them carry the initiative or could sink it. |
Complexitydifferent | Medium | High | Low | Low |
Timedifferent | 45-120 min | 2-6 h | 20–45 min | 45-90 min |
Participantsdifferent | 2-6 | 3-8 | Small cross-functional group | 2-8 |
Formatdifferent | Workshop + async | Workshop + async | Workshop | Workshop + async |
Outputdifferent | Change Matrix, Cause Hypotheses, Validation Questions, Action List | Fault Tree, Critical Paths, Cause Hypotheses, Control Actions | Risk list, Mitigation plan, Assumption log | Assumption List, Critical Assumptions, Learning Plan |
Tagsno overlap | ChangeRoot causeTroubleshootingComparison | RiskRoot causeSafety | RiskDecisionFailurePlanning | AssumptionsRiskDecisionDiscovery |



