View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Operations Change Analysis | ![]() Operations Fault Tree Analysis | ![]() Agile Ideal Days | ![]() Operations Failure Mode and Effects Analysis |
|---|---|---|---|---|
Purposedifferent | For a deviation after a change, the method isolates the influence of the altered condition. It narrows down which differences are relevant and which are just accompanying noise. | For a critical top event with several possible triggers, the method logically models failure paths. It makes visible which combinations of conditions can lead to damage. | When effort needs to be thought of as real working time, it offers a simple common denominator for comparison. It sorts work by value, risk, and delivery ability. The result is captured as Ideal Day Estimates, Assumption Notes, and Capacity Caveats. | For a process, product, or service with noticeable failure risks, the method assesses possible failure modes in advance. It directs attention to combinations of occurrence, effect, and detectability. |
Complexitydifferent | Medium | High | Low | High |
Timedifferent | 45-120 min | 2-6 h | 15-60 min | 2-6 h |
Participantsdifferent | 2-6 | 3-8 | 2-9 | 3-10 |
Formatdifferent | Workshop + async | Workshop + async | Workshop + async | Workshop |
Outputdifferent | Change Matrix, Cause Hypotheses, Validation Questions, Action List | Fault Tree, Critical Paths, Cause Hypotheses, Control Actions | Ideal Day Estimates, Assumption Notes, Capacity Caveats | FMEA Table, Risk Priority, Mitigation Actions |
Tagsno overlap | ChangeRoot causeTroubleshootingComparison | RiskRoot causeSafety | EstimationEffortAgile | RiskQualityOperationsRoot cause |



