methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for CATWOE Analysis.
Systems Thinking
CATWOE Analysis
Paper illustration for Risk Storming.
Architecture
Risk Storming
Paper illustration of Power-Interest Grid with a method-specific labelled workspace.
Facilitation
Power Interest Grid
Paper illustration of the Consensus Workshop working structure.
Facilitation
Consensus Workshop
Purposedifferent
CATWOE structures a problem from six viewpoints and prevents too narrow a view of the situation. Different experiences of the system become comparably discussable this way.Helps clarify architecture context, options, and consequences in concrete terms. It organizes technical context, alternatives, and consequences. The result is captured as an Annotated Diagram, a Prioritized Risk List, and an Action Backlog.When many stakeholders compete for attention at once, the Power Interest Grid sorts them by influence and stake. It turns individual contributions into a visible selection. The result is captured as a Power Interest Grid and a stakeholder-specific strategy.When a group needs a solid decision without outvoting individual factions, a Consensus Workshop creates a negotiable common ground. It makes agreement, reservations, and open tensions discussable at the same time.
Complexitydifferent
MediumLowLowMedium
Timedifferent
45-90 min60-90 min30-60 min1-3 h
Participantsdifferent
3-84-122-85-30
Formatdifferent
Workshop + asyncWorkshopWorkshopWorkshop
Outputdifferent
CATWOE Canvas, Root Definition, Stakeholder Perspectives, ConstraintsAnnotated Diagram, Prioritized Risk List, Action BacklogPower Interest Grid, Strategy per StakeholderConsensus Clusters, Theme Titles, Priority Areas
Tagsno overlap
Systems thinkingFramingStakeholders
RiskArchitectureWorkshopValidation
StakeholdersFacilitationAlignmentPlanning
FacilitationConsensusWorkshopAlignment
Add more methods