View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Systems Thinking CATWOE Analysis | ![]() Facilitation Mind Mapping | ![]() Facilitation Stakeholder Salience Model | ![]() Facilitation Power Interest Grid |
|---|---|---|---|---|
Purposedifferent | CATWOE structures a problem from six viewpoints and prevents too narrow a view of the situation. Different experiences of the system become comparably discussable this way. | When a topic is still unclear and too many thoughts surface at once, Mind Mapping creates an open surface for ordering them. It makes connections, subtopics, and starting points visible without fixing them too early. | When stakeholders appear to matter very differently, the Stakeholder Salience Model rates their actual priority through power, legitimacy, and urgency. It turns individual contributions into a visible selection. The result is captured as a Salience diagram and a class-based strategy. | When many stakeholders compete for attention at once, the Power Interest Grid sorts them by influence and stake. It turns individual contributions into a visible selection. The result is captured as a Power Interest Grid and a stakeholder-specific strategy. |
Complexitydifferent | Medium | Low | Medium | Low |
Timedifferent | 45-90 min | 15-45 min | 60-90 min | 30-60 min |
Participantsdifferent | 3-8 | 1-10 | 3-6 | 2-8 |
Formatdifferent | Workshop + async | Workshop + async | Workshop | Workshop |
Outputdifferent | CATWOE Canvas, Root Definition, Stakeholder Perspectives, Constraints | Mind Map, Topic Clusters, Open Questions | Salience Diagram, Strategy per Class | Power Interest Grid, Strategy per Stakeholder |
Tagsno overlap | Systems thinkingFramingStakeholders | BrainstormingIdeasMappingStructureFacilitation | StakeholdersFacilitationAlignmentGovernance | StakeholdersFacilitationAlignmentPlanning |



