methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
A paper-based illustration representing C4 Model with its core stages and visible working result.
Architecture
C4 Model
Stakeholder Mapping
Facilitation
Stakeholder Mapping
Paper illustration of Power-Interest Grid with a method-specific labelled workspace.
Facilitation
Power Interest Grid
Paper illustration for Communication Plan
Delivery
Communication Plan
Purposedifferent
The C4 Model makes a system legible across several resolution levels, from context down to code. It suits situations where different audiences need to understand the same architecture from different altitudes.When an initiative depends on many people, interests, and power dynamics, Stakeholder Mapping systematically orders the environment. It shows who influences, who is affected, and where relationship management or safeguarding matters first.When many stakeholders compete for attention at once, the Power Interest Grid sorts them by influence and stake. It turns individual contributions into a visible selection. The result is captured as a Power Interest Grid and a stakeholder-specific strategy.When many people need to be informed in parallel and messages would otherwise arrive unevenly or too late, a Communication Plan orders communication reliably. Channels, audiences, and cadences interlock so important information doesn't get lost.
Complexitysame
LowLowLowLow
Timedifferent
1-4 h60–90 min30-60 min45-90 min
Participantsdifferent
1-52-82-82-6
Formatdifferent
Workshop + asyncWorkshop + asyncWorkshopWorkshop + async
Outputdifferent
Context Diagram, Container Diagram, Component DiagramStakeholder Map, Engagement Plan, Risk NotesPower Interest Grid, Strategy per StakeholderCommunication Plan, Channel Matrix, Message Cadence
Tagsno overlap
ArchitectureCommunicationVisualization
StakeholdersAlignmentFacilitationChange
StakeholdersFacilitationAlignmentPlanning
CommunicationStakeholdersDeliveryPlanning
Add more methods