methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
A paper-based illustration representing C4 Model with its core stages and visible working result.
Architecture
C4 Model
Stakeholder Mapping
Facilitation
Stakeholder Mapping
Paper illustration for CATWOE Analysis.
Systems Thinking
CATWOE Analysis
Paper illustration of Power-Interest Grid with a method-specific labelled workspace.
Facilitation
Power Interest Grid
Purposedifferent
The C4 Model makes a system legible across several resolution levels, from context down to code. It suits situations where different audiences need to understand the same architecture from different altitudes.When an initiative depends on many people, interests, and power dynamics, Stakeholder Mapping systematically orders the environment. It shows who influences, who is affected, and where relationship management or safeguarding matters first.CATWOE structures a problem from six viewpoints and prevents too narrow a view of the situation. Different experiences of the system become comparably discussable this way.When many stakeholders compete for attention at once, the Power Interest Grid sorts them by influence and stake. It turns individual contributions into a visible selection. The result is captured as a Power Interest Grid and a stakeholder-specific strategy.
Complexitydifferent
LowLowMediumLow
Timedifferent
1-4 h60–90 min45-90 min30-60 min
Participantsdifferent
1-52-83-82-8
Formatdifferent
Workshop + asyncWorkshop + asyncWorkshop + asyncWorkshop
Outputdifferent
Context Diagram, Container Diagram, Component DiagramStakeholder Map, Engagement Plan, Risk NotesCATWOE Canvas, Root Definition, Stakeholder Perspectives, ConstraintsPower Interest Grid, Strategy per Stakeholder
Tagsno overlap
ArchitectureCommunicationVisualization
StakeholdersAlignmentFacilitationChange
Systems thinkingFramingStakeholders
StakeholdersFacilitationAlignmentPlanning
Add more methods