methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
A paper-based illustration representing C4 Model with its core stages and visible working result.
Architecture
C4 Model
Paper illustration for Sailboat Retrospective
Agile
Sailboat Retrospective
Paper illustration of a team retrospective with three separate Start, Stop, and Continue areas and a shared action list.
Agile
Start Stop Continue
Paper illustration for Mad Sad Glad
Agile
Mad Sad Glad
Purposedifferent
The C4 Model makes a system legible across several resolution levels, from context down to code. It suits situations where different audiences need to understand the same architecture from different altitudes.When a team wants to read momentum, brakes, and risks together, it offers an easily understandable picture of the situation. It makes drive, obstacles, and headwind visible in the same picture.When a team wants to deliberately adjust its working behavior, it makes habits visible and assessable. It focuses on concrete changes instead of diffuse mood.When a team's or workshop's mood needs to become readable, it structures emotional signals with little setup. It makes strain, relief, and sources of energy tangible.
Complexitysame
LowLowLowLow
Timedifferent
1-4 h45-90 min30-60 min30-60 min
Participantsdifferent
1-54-123-123-10
Formatdifferent
Workshop + asyncWorkshopWorkshopWorkshop
Outputdifferent
Context Diagram, Container Diagram, Component DiagramSailboat Board, Risks, Improvement ActionsStart Stop Continue Board, Improvement ActionsEmotion Board, Themes, Action Items
Tagsno overlap
ArchitectureCommunicationVisualization
RetrospectiveTeamImprovement
RetrospectiveImprovementTeamReflection
RetrospectiveTeamReflection
Add more methods