methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
A paper-based illustration representing C4 Model with its core stages and visible working result.
Architecture
C4 Model
Paper illustration of Power-Interest Grid with a method-specific labelled workspace.
Facilitation
Power Interest Grid
Paper illustration for Alignment Mapping.
Facilitation
Alignment Mapping
Stakeholder Mapping
Facilitation
Stakeholder Mapping
Purposedifferent
The C4 Model makes a system legible across several resolution levels, from context down to code. It suits situations where different audiences need to understand the same architecture from different altitudes.When many stakeholders compete for attention at once, the Power Interest Grid sorts them by influence and stake. It turns individual contributions into a visible selection. The result is captured as a Power Interest Grid and a stakeholder-specific strategy.When several people work toward one goal but hold different mental maps, Alignment Mapping makes the discrepancies visible. It arranges goals, assumptions, and priorities so shared direction becomes verifiable.When an initiative depends on many people, interests, and power dynamics, Stakeholder Mapping systematically orders the environment. It shows who influences, who is affected, and where relationship management or safeguarding matters first.
Complexitydifferent
LowLowMediumLow
Timedifferent
1-4 h30-60 min1-2 h60–90 min
Participantsdifferent
1-52-84-122-8
Formatdifferent
Workshop + asyncWorkshopWorkshopWorkshop + async
Outputdifferent
Context Diagram, Container Diagram, Component DiagramPower Interest Grid, Strategy per StakeholderAlignment Map, Open Issues, Decision QuestionsStakeholder Map, Engagement Plan, Risk Notes
Tagsno overlap
ArchitectureCommunicationVisualization
StakeholdersFacilitationAlignmentPlanning
AlignmentStakeholdersStrategyFacilitation
StakeholdersAlignmentFacilitationChange
Add more methods