methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
A paper-based illustration representing C4 Model with its core stages and visible working result.
Architecture
C4 Model
Decision Tree method illustration showing its working structure
Decision Making
Decision Tree
Paper illustration for Communication Plan
Delivery
Communication Plan
Paper illustration of Cost of Delay with its method-specific working model.
Delivery
Cost of Delay
Purposedifferent
The C4 Model makes a system legible across several resolution levels, from context down to code. It suits situations where different audiences need to understand the same architecture from different altitudes.For decisions with follow-on paths and dependencies, a linear comparison is often not enough. A Decision Tree shows how options branch under conditions and which consequences hang on each branch.When many people need to be informed in parallel and messages would otherwise arrive unevenly or too late, a Communication Plan orders communication reliably. Channels, audiences, and cadences interlock so important information doesn't get lost.Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence.
Complexitydifferent
LowMediumLowHigh
Timedifferent
1-4 h30-90 min45-90 min90-180 min
Participantsdifferent
1-51-62-63-8
Formatdifferent
Workshop + asyncWorkshop + asyncWorkshop + asyncWorkshop
Outputdifferent
Context Diagram, Container Diagram, Component DiagramDecision Tree, Option Map, Assumption ListCommunication Plan, Channel Matrix, Message CadenceCoD Table, Prioritization Sequence
Tagsno overlap
ArchitectureCommunicationVisualization
DecisionTreeOptions
CommunicationStakeholdersDeliveryPlanning
PrioritizationDeliveryEconomicsDecision
Add more methods