View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Agile Bucket System | ![]() Systems Thinking Intervention Mapping | ![]() Systems Thinking Future Reality Tree | ![]() Agile Planning Poker |
|---|---|---|---|---|
Purposedifferent | When a large batch of work needs a fast, rough estimate, it sorts items into predefined size buckets. It sorts work by value, risk, and delivery ability. The result is captured as a Bucketed Backlog, Relative Estimates, and Split Candidates. | Intervention Mapping translates a need for change into a planned, evaluable program. The method connects target group, determinants, actions, and measurement into a traceable chain. | A Future Reality Tree shows how desired actions are meant to lead to a better system state. The method checks whether a path of change holds together logically before time flows into implementation. | When estimates within the team diverge too much, it puts differing expectations on a common test bench. It separates rough complexity from unspoken assumptions. |
Complexitydifferent | Medium | High | High | Low |
Timedifferent | 30-90 min | 1-5 Tage | 2-4 h | 2-5 min je Item |
Participantsdifferent | 3-12 | 4-12 | 3-8 | 3-9 |
Formatdifferent | Workshop | Workshop + async | Workshop | Workshop + async |
Outputdifferent | Bucketed Backlog, Relative Estimates, Split Candidates | Logic Model, Change Objectives, Intervention Components, Evaluation Plan | Future Reality Tree, Negative Branches, Assumption List, Improved Injections | Relative Estimates, Assumption Notes, Split Candidates |
Tagsno overlap | EstimationBacklogRelative sizing | ChangeSystems thinkingCapability | Theory of ConstraintsSystems thinkingChange | EstimationAgileRelative sizingTeam |



