methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Bucket System.
Agile
Bucket System
Paper illustration for Current Reality Tree
Systems Thinking
Current Reality Tree
Iceberg Model method illustration showing its working structure
Systems Thinking
Iceberg Model
Paper illustration for Behavior Over Time Graph.
Systems Thinking
Behavior Over Time Graph
Purposedifferent
When a large batch of work needs a fast, rough estimate, it sorts items into predefined size buckets. It sorts work by value, risk, and delivery ability. The result is captured as a Bucketed Backlog, Relative Estimates, and Split Candidates.A Current Reality Tree condenses many symptoms into a few causal chains. The method makes visible which core problems drive several negative effects at once.The Iceberg Model separates visible events from patterns, structures, and mental models. This turns a single observation into a deeper understanding of why a problem keeps recurring.A Behavior Over Time Graph shows how a metric or observation develops over time. The method makes trends, breaks, and recurring patterns visible that get lost in snapshots.
Complexitydifferent
MediumHighLowLow
Timedifferent
30-90 min2-6 h30-60 min20-45 min
Participantsdifferent
3-123-82-101-10
Formatdifferent
WorkshopWorkshopWorkshop + asyncWorkshop + async
Outputdifferent
Bucketed Backlog, Relative Estimates, Split CandidatesCurrent Reality Tree, Core Problems, Intervention IdeasIceberg Worksheet, Pattern Notes, Intervention IdeasBehavior Over Time Graph, Trend Hypotheses, Key Events
Tagsno overlap
EstimationBacklogRelative sizing
Systems thinkingRoot causeConstraintsCausality
Systems thinkingRoot causePatterns
Systems thinkingPatternsDynamics
Add more methods