View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Operations Bottleneck Analysis | ![]() Delivery Value Stream Mapping | ![]() Engineering Goal Question Metric |
|---|---|---|---|
Purposedifferent | For a flow that backs up at one point, the method looks for the capacity limit with the greatest leverage. It explains why extra effort elsewhere barely improves throughput. | When delivery work dissolves into wait times, handoffs, and hidden effort, Value Stream Mapping makes the actual flow visible. The method exposes bottlenecks, idle time, and feedback loops so lead time and improvement levers become tangible. | Helps clarify technical problems, hypotheses, and next steps in concrete terms. It breaks a technical problem into testable parts. The result is captured as a GQM table and metric briefs. |
Complexitysame | Medium | Medium | Medium |
Timedifferent | 1-3 h | 1-3 h | 90-180 min |
Participantsdifferent | 3-8 | 4-10 | 3-6 |
Formatdifferent | Workshop + async | Workshop | Workshop |
Outputdifferent | Bottleneck Map, Flow Metrics, Improvement Options, Follow-up Measures | Current-state map, Future-state map, Bottleneck list | GQM Table, Metric Profiles |
Tagsno overlap | FlowMeasurementConstraints | LeanFlowWasteDelivery | MetricsMeasurementEngineeringAlignment |
Often compared together
Methods with strong topical overlap with the current selection, not yet in the comparison.






