methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration: scenarios and architectural decisions are connected to identified risks.
Architecture
ATAM (Architecture Tradeoff Analysis Method)
Quality Attribute Workshop workspace showing the question, observations, and next decision.
Architecture
Quality Attribute Workshop
Paper illustration for Failure Mode and Effects Analysis
Operations
Failure Mode and Effects Analysis
Paper illustration for Risk Storming.
Architecture
Risk Storming
Purposedifferent
ATAM helps teams weigh architecture decisions when quality goals compete. The team considers business goals, stakeholder expectations, and technical decisions together. The evaluation shows which risks need further investigation.A Quality Attribute Workshop translates quality requirements into concrete scenarios and architecture impulses. The method brings product, engineering, and operations to the same view of desired properties.For a process, product, or service with noticeable failure risks, the method assesses possible failure modes in advance. It directs attention to combinations of occurrence, effect, and detectability.Helps clarify architecture context, options, and consequences in concrete terms. It organizes technical context, alternatives, and consequences. The result is captured as an Annotated Diagram, a Prioritized Risk List, and an Action Backlog.
Complexitydifferent
HighMediumHighLow
Timedifferent
Several meetings plus preparation and analysis; total effort depends on scope2-4 h2-6 h60-90 min
Participantsdifferent
Evaluation team, architects, and relevant stakeholders5-153-104-12
Formatdifferent
Workshop + asyncWorkshopWorkshopWorkshop
Outputdifferent
Prioritized quality scenarios in a utility tree, Architecture risks with reasoning and assumptions, Sensitivity and trade-off points, Findings report with open investigationsQuality Scenarios, Priority List, Architecture ConcernsFMEA Table, Risk Priority, Mitigation ActionsAnnotated Diagram, Prioritized Risk List, Action Backlog
Tagsno overlap
ArchitectureQualityRiskTradeoffsStakeholders
RequirementsArchitectureWorkshop
RiskQualityOperationsRoot cause
RiskArchitectureWorkshopValidation
Add more methods