methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration: scenarios and architectural decisions are connected to identified risks.
Architecture
ATAM (Architecture Tradeoff Analysis Method)
Paper illustration of Linked Open Terms with its method-specific working model.
Knowledge Modeling
Linked Open Terms
Design sheets and interface cards connect to jointly written pseudocode with highlighted unresolved questions.
Architecture
ARID (Active Reviews for Intermediate Designs)
Paper illustration for Risk Storming.
Architecture
Risk Storming
Purposedifferent
ATAM helps teams weigh architecture decisions when quality goals compete. The team considers business goals, stakeholder expectations, and technical decisions together. The evaluation shows which risks need further investigation.Linked Open Terms connects terminology work with linked-data thinking and makes terminology technically connectable. Vocabulary, meanings, and references can thereby be maintained consistently.ARID examines how well developers can work with a technical design. It focuses on a part of the system that can still be revised, between the architecture overview and the detailed specification.Helps clarify architecture context, options, and consequences in concrete terms. It organizes technical context, alternatives, and consequences. The result is captured as an Annotated Diagram, a Prioritized Risk List, and an Action Backlog.
Complexitydifferent
HighMediumMediumLow
Timedifferent
Several meetings plus preparation and analysis; total effort depends on scopeWochen bis Monate2–4 h review as a planning range; preparation and evaluation additional60-90 min
Participantsdifferent
Evaluation team, architects, and relevant stakeholders2-8Designers, developers as users, and facilitation4-12
Formatdifferent
Workshop + asyncWorkshop + asyncWorkshop + asyncWorkshop
Outputdifferent
Prioritized quality scenarios in a utility tree, Architecture risks with reasoning and assumptions, Sensitivity and trade-off points, Findings report with open investigationsOntology Requirements, Conceptual Model, Published Ontology, Documentation, Maintenance PlanPrioritized development tasks, Jointly produced code or pseudocode, Observed difficulties and open design questions, Proposed design revisionsAnnotated Diagram, Prioritized Risk List, Action Backlog
Tagsno overlap
ArchitectureQualityRiskTradeoffsStakeholders
OntologyMethodologyAgileSemantic
ArchitectureEngineeringFeedbackValidationTasks
RiskArchitectureWorkshopValidation
Add more methods