methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration: scenarios and architectural decisions are connected to identified risks.
Architecture
ATAM (Architecture Tradeoff Analysis Method)
Paper illustration of a four-column Kanban board with limited ongoing work, a visible blocker and a review loop.
Engineering
Kanban
Value Stream Mapping workspace showing the question, observations, and next decision.
Delivery
Value Stream Mapping
Paper illustration for Failure Mode and Effects Analysis
Operations
Failure Mode and Effects Analysis
Purposedifferent
ATAM helps teams weigh architecture decisions when quality goals compete. The team considers business goals, stakeholder expectations, and technical decisions together. The evaluation shows which risks need further investigation.When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable.When delivery work dissolves into wait times, handoffs, and hidden effort, Value Stream Mapping makes the actual flow visible. The method exposes bottlenecks, idle time, and feedback loops so lead time and improvement levers become tangible.For a process, product, or service with noticeable failure risks, the method assesses possible failure modes in advance. It directs attention to combinations of occurrence, effect, and detectability.
Complexitydifferent
HighMediumMediumHigh
Timedifferent
Several meetings plus preparation and analysis; total effort depends on scopeOngoing1-3 h2-6 h
Participantsdifferent
Evaluation team, architects, and relevant stakeholders2-124-103-10
Formatdifferent
Workshop + asyncWorkshop + asyncWorkshopWorkshop
Outputdifferent
Prioritized quality scenarios in a utility tree, Architecture risks with reasoning and assumptions, Sensitivity and trade-off points, Findings report with open investigationsKanban board, WIP policies, Flow metricsCurrent-state map, Future-state map, Bottleneck listFMEA Table, Risk Priority, Mitigation Actions
Tagsno overlap
ArchitectureQualityRiskTradeoffsStakeholders
FlowVisual managementDelivery
LeanFlowWasteDelivery
RiskQualityOperationsRoot cause
Add more methods