methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration: scenarios and architectural decisions are connected to identified risks.
Architecture
ATAM (Architecture Tradeoff Analysis Method)
Paper illustration of Hooked Model with its method-specific working model.
Growth
Hooked Model
Paper illustration of two considered options leading to a decision record with a marked status and visible consequences.
Architecture
Architecture Decision Record
Paper illustration of RAID Log with a method-specific labelled workspace.
Delivery
RAID Log
Purposedifferent
ATAM helps teams weigh architecture decisions when quality goals compete. The team considers business goals, stakeholder expectations, and technical decisions together. The evaluation shows which risks need further investigation.The Hooked Model helps clarify engagement loops, user behavior, and experiments. It makes repeat behavior measurable and captures the result as a hooked loop, trigger map, and reward design.An ADR permanently records an architecture decision with context, trade-offs, and consequence. It creates continuity for later changes because the decision path stays traceable.Helps clarify scope, sequence, and delivery flow in concrete terms. It makes work, boundaries, and order steerable. The result is captured as a RAID Log and a source for status reporting.
Complexitydifferent
HighMediumLowLow
Timedifferent
Several meetings plus preparation and analysis; total effort depends on scopeMultiple workshops over several weeks15-45 min30 min Setup, dann laufend
Participantsdifferent
Evaluation team, architects, and relevant stakeholders2-81-31-3 maintaining, briefing for everyone
Formatdifferent
Workshop + asyncWorkshop + asyncAsyncAsync
Outputdifferent
Prioritized quality scenarios in a utility tree, Architecture risks with reasoning and assumptions, Sensitivity and trade-off points, Findings report with open investigationsHooked loop, Trigger map, Reward design, Ethics checkADR File, Decision Log, RationaleRAID Log, Status Report Source
Tagsno overlap
ArchitectureQualityRiskTradeoffsStakeholders
GrowthBehaviorRetention
ArchitectureRationaleDocumentationGovernance
RiskTrackingStakeholdersGovernance
Add more methods