methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration: scenarios and architectural decisions are connected to identified risks.
Architecture
ATAM (Architecture Tradeoff Analysis Method)
Paper notes move from an inbox to action, project and calendar collections.
Operations
Getting Things Done
Paper illustration of Stakeholder Salience Model with its method-specific working model.
Facilitation
Stakeholder Salience Model
Paper illustration of RAID Log with a method-specific labelled workspace.
Delivery
RAID Log
Purposedifferent
ATAM helps teams weigh architecture decisions when quality goals compete. The team considers business goals, stakeholder expectations, and technical decisions together. The evaluation shows which risks need further investigation.With many open commitments and ideas in daily life, a reliable external storage system emerges. The method relieves the mind so priority and context don't have to compete in memory.When stakeholders appear to matter very differently, the Stakeholder Salience Model rates their actual priority through power, legitimacy, and urgency. It turns individual contributions into a visible selection. The result is captured as a Salience diagram and a class-based strategy.Helps clarify scope, sequence, and delivery flow in concrete terms. It makes work, boundaries, and order steerable. The result is captured as a RAID Log and a source for status reporting.
Complexitydifferent
HighMediumMediumLow
Timedifferent
Several meetings plus preparation and analysis; total effort depends on scope1-2 h Setup, laufend60-90 min30 min Setup, dann laufend
Participantsdifferent
Evaluation team, architects, and relevant stakeholders13-61-3 maintaining, briefing for everyone
Formatdifferent
Workshop + asyncAsyncWorkshopAsync
Outputdifferent
Prioritized quality scenarios in a utility tree, Architecture risks with reasoning and assumptions, Sensitivity and trade-off points, Findings report with open investigationsAction Lists, Project List, Review RoutineSalience Diagram, Strategy per ClassRAID Log, Status Report Source
Tagsno overlap
ArchitectureQualityRiskTradeoffsStakeholders
ProductivityPlanningTasksExecution
StakeholdersFacilitationAlignmentGovernance
RiskTrackingStakeholdersGovernance
Add more methods