methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration: scenarios and architectural decisions are connected to identified risks.
Architecture
ATAM (Architecture Tradeoff Analysis Method)
Paper illustration of Cost of Delay with its method-specific working model.
Delivery
Cost of Delay
Paper illustration of a calm four-quadrant Assumption Map with hypothesis cards and emphasis on important assumptions with little evidence.
Product Discovery
Assumption Mapping
Paper illustration for Risk Storming.
Architecture
Risk Storming
Purposedifferent
ATAM helps teams weigh architecture decisions when quality goals compete. The team considers business goals, stakeholder expectations, and technical decisions together. The evaluation shows which risks need further investigation.Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence.When assumptions still sit unordered in the room, it weighs uncertainty against leverage. It makes visible which hypotheses should be checked first.Helps clarify architecture context, options, and consequences in concrete terms. It organizes technical context, alternatives, and consequences. The result is captured as an Annotated Diagram, a Prioritized Risk List, and an Action Backlog.
Complexitydifferent
HighHighMediumLow
Timedifferent
Several meetings plus preparation and analysis; total effort depends on scope90-180 min45-60 min60-90 min
Participantsdifferent
Evaluation team, architects, and relevant stakeholders3-82-84-12
Formatdifferent
Workshop + asyncWorkshopWorkshop + asyncWorkshop
Outputdifferent
Prioritized quality scenarios in a utility tree, Architecture risks with reasoning and assumptions, Sensitivity and trade-off points, Findings report with open investigationsCoD Table, Prioritization SequenceAssumption map, Test backlog, Risk rankingAnnotated Diagram, Prioritized Risk List, Action Backlog
Tagsno overlap
ArchitectureQualityRiskTradeoffsStakeholders
PrioritizationDeliveryEconomicsDecision
AssumptionsRiskExperimentsValidation
RiskArchitectureWorkshopValidation
Add more methods