methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration: scenarios and architectural decisions are connected to identified risks.
Architecture
ATAM (Architecture Tradeoff Analysis Method)
Paper illustration for Alignment Mapping.
Facilitation
Alignment Mapping
Paper illustration for CATWOE Analysis.
Systems Thinking
CATWOE Analysis
Paper illustration of Power-Interest Grid with a method-specific labelled workspace.
Facilitation
Power Interest Grid
Purposedifferent
ATAM helps teams weigh architecture decisions when quality goals compete. The team considers business goals, stakeholder expectations, and technical decisions together. The evaluation shows which risks need further investigation.When several people work toward one goal but hold different mental maps, Alignment Mapping makes the discrepancies visible. It arranges goals, assumptions, and priorities so shared direction becomes verifiable.CATWOE structures a problem from six viewpoints and prevents too narrow a view of the situation. Different experiences of the system become comparably discussable this way.When many stakeholders compete for attention at once, the Power Interest Grid sorts them by influence and stake. It turns individual contributions into a visible selection. The result is captured as a Power Interest Grid and a stakeholder-specific strategy.
Complexitydifferent
HighMediumMediumLow
Timedifferent
Several meetings plus preparation and analysis; total effort depends on scope1-2 h45-90 min30-60 min
Participantsdifferent
Evaluation team, architects, and relevant stakeholders4-123-82-8
Formatdifferent
Workshop + asyncWorkshopWorkshop + asyncWorkshop
Outputdifferent
Prioritized quality scenarios in a utility tree, Architecture risks with reasoning and assumptions, Sensitivity and trade-off points, Findings report with open investigationsAlignment Map, Open Issues, Decision QuestionsCATWOE Canvas, Root Definition, Stakeholder Perspectives, ConstraintsPower Interest Grid, Strategy per Stakeholder
Tags1 shared
ArchitectureQualityRiskTradeoffsStakeholders
AlignmentStakeholdersStrategyFacilitation
Systems thinkingFramingStakeholders
StakeholdersFacilitationAlignmentPlanning
Add more methods