methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of an assumption matrix with prioritized test cards
Decision Making
Assumption Surfacing
Paper notes move from an inbox to action, project and calendar collections.
Operations
Getting Things Done
Paper illustration for Risk Storming.
Architecture
Risk Storming
A hypothetical failure makes concrete risks, signals, and fitting mitigations visible.
Decision Making
Pre-Mortem
Purposedifferent
Plans often contain assumptions that were never openly stated and remain dangerous precisely because of that. Assumption Surfacing makes these silent premises visible and prioritizes which of them carry the initiative or could sink it.With many open commitments and ideas in daily life, a reliable external storage system emerges. The method relieves the mind so priority and context don't have to compete in memory.Helps clarify architecture context, options, and consequences in concrete terms. It organizes technical context, alternatives, and consequences. The result is captured as an Annotated Diagram, a Prioritized Risk List, and an Action Backlog.In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures.
Complexitydifferent
LowMediumLowLow
Timedifferent
45-90 min1-2 h Setup, laufend60-90 min20–45 min
Participantsdifferent
2-814-12Small cross-functional group
Formatdifferent
Workshop + asyncAsyncWorkshopWorkshop
Outputdifferent
Assumption List, Critical Assumptions, Learning PlanAction Lists, Project List, Review RoutineAnnotated Diagram, Prioritized Risk List, Action BacklogRisk list, Mitigation plan, Assumption log
Tagsno overlap
AssumptionsRiskDecisionDiscovery
ProductivityPlanningTasksExecution
RiskArchitectureWorkshopValidation
RiskDecisionFailurePlanning
Add more methods