View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Decision Making Assumption Surfacing | ![]() Systems Thinking Future Reality Tree | ![]() Innovation Design Sprint | ![]() Product Discovery Concierge MVP |
|---|---|---|---|---|
Purposedifferent | Plans often contain assumptions that were never openly stated and remain dangerous precisely because of that. Assumption Surfacing makes these silent premises visible and prioritizes which of them carry the initiative or could sink it. | A Future Reality Tree shows how desired actions are meant to lead to a better system state. The method checks whether a path of change holds together logically before time flows into implementation. | When the product question is unclear and time pressure is high, the method takes a team from an open idea to a testable solution. It connects problem understanding, decision, and learning in one compact format, lowering the risk of spending a lot of energy on a mere guess. | When an idea can first fail or grow through genuine hands-on support, it relies on manual work instead of automation. It shows whether user value holds up even under manual execution. |
Complexitydifferent | Low | High | High | Medium |
Timedifferent | 45-90 min | 2-4 h | 4-5 Tage | 1-4 Wochen |
Participantsdifferent | 2-8 | 3-8 | 5-8 | 3-10 Kunden |
Formatdifferent | Workshop + async | Workshop | Workshop | Workshop + async |
Outputdifferent | Assumption List, Critical Assumptions, Learning Plan | Future Reality Tree, Negative Branches, Assumption List, Improved Injections | Prototype, Test Findings, Decision Rationale | Concierge Learnings, Service Blueprint, MVP Risks |
Tagsno overlap | AssumptionsRiskDecisionDiscovery | Theory of ConstraintsSystems thinkingChange | Design sprintPrototypeValidationInnovation | MVPValidationServiceDiscovery |



