View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Decision Making Assumption Surfacing | ![]() Facilitation Decision Jam | ![]() Product Discovery Test Card | ![]() Product Discovery Assumption Mapping |
|---|---|---|---|---|
Purposedifferent | Plans often contain assumptions that were never openly stated and remain dangerous precisely because of that. Assumption Surfacing makes these silent premises visible and prioritizes which of them carry the initiative or could sink it. | When a decision is stuck, Decision Jam loosens the knot through structured separation of problem, idea, and selection. The format creates movement without jumping prematurely at the first seemingly elegant answer. | The Test Card turns a critical assumption into a testable claim and specifies in advance which result counts as success. | When assumptions still sit unordered in the room, it weighs uncertainty against leverage. It makes visible which hypotheses should be checked first. |
Complexitydifferent | Low | Low | Low | Medium |
Timedifferent | 45-90 min | 60-90 min | 20-35 min | 45-60 min |
Participantsdifferent | 2-8 | 4-10 | 1-5 | 2-8 |
Formatdifferent | Workshop + async | Workshop | Workshop + async | Workshop + async |
Outputdifferent | Assumption List, Critical Assumptions, Learning Plan | Problem Cluster, Prioritized Challenge, Experiment | Test Card with a pre-set threshold | Assumption map, Test backlog, Risk ranking |
Tagsno overlap | AssumptionsRiskDecisionDiscovery | FacilitationDecisionProblem solvingWorkshop | ExperimentsValidationDiscoveryHypothesis | AssumptionsRiskExperimentsValidation |



