methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of an assumption matrix with prioritized test cards
Decision Making
Assumption Surfacing
Paper illustration of Cost of Delay with its method-specific working model.
Delivery
Cost of Delay
A hypothetical failure makes concrete risks, signals, and fitting mitigations visible.
Decision Making
Pre-Mortem
Paper illustration for Constraint Analysis.
Decision Making
Constraint Analysis
Purposedifferent
Plans often contain assumptions that were never openly stated and remain dangerous precisely because of that. Assumption Surfacing makes these silent premises visible and prioritizes which of them carry the initiative or could sink it.Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence.In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures.When an initiative stalls, the limit often lies not in the idea but in hard or soft boundary conditions. Constraint Analysis separates these limits and shows which of them can actually be shaped.
Complexitydifferent
LowHighLowLow
Timedifferent
45-90 min90-180 min20–45 min30-90 min
Participantsdifferent
2-83-8Small cross-functional group2-8
Formatdifferent
Workshop + asyncWorkshopWorkshopWorkshop + async
Outputdifferent
Assumption List, Critical Assumptions, Learning PlanCoD Table, Prioritization SequenceRisk list, Mitigation plan, Assumption logConstraint List, Hard/Soft Classification, Option Impact Notes, Decision Boundaries
Tags1 shared
AssumptionsRiskDecisionDiscovery
PrioritizationDeliveryEconomicsDecision
RiskDecisionFailurePlanning
ConstraintsDecisionPlanningOptions
Add more methods