View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Decision Making Assumption Surfacing | ![]() Operations ABC Analysis | ![]() Delivery Cost of Delay | ![]() Product Strategy DIBB |
|---|---|---|---|---|
Purposedifferent | Plans often contain assumptions that were never openly stated and remain dangerous precisely because of that. Assumption Surfacing makes these silent premises visible and prioritizes which of them carry the initiative or could sink it. | With many similar objects of differing economic significance, the method prioritizes effort by effect. It separates what needs regular steering from what rarely needs attention. | Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence. | DIBB helps clarify target groups, value, goals, and priorities by making the logic behind a decision explicit. It captures results as a DIBB document, belief list, bet list, and learning report. |
Complexitydifferent | Low | Low | High | Low |
Timedifferent | 45-90 min | 30-60 min | 90-180 min | 1-2 h |
Participantsdifferent | 2-8 | 1-5 | 3-8 | 2-8 |
Formatdifferent | Workshop + async | Async | Workshop | Workshop + async |
Outputdifferent | Assumption List, Critical Assumptions, Learning Plan | ABC Classification, Focus Rules, Control List | CoD Table, Prioritization Sequence | DIBB document, Belief list, Bet list, Learning report |
Tagsno overlap | AssumptionsRiskDecisionDiscovery | PrioritizationOperationsPortfolio | PrioritizationDeliveryEconomicsDecision | StrategyDecisionAssumptionsHypothesis |



