View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Product Discovery Assumption Mapping | ![]() Architecture Risk Storming | ![]() Growth A/B Testing | ![]() Product Discovery Smoke Test |
|---|---|---|---|---|
Purposedifferent | When assumptions still sit unordered in the room, it weighs uncertainty against leverage. It makes visible which hypotheses should be checked first. | Helps clarify architecture context, options, and consequences in concrete terms. It organizes technical context, alternatives, and consequences. The result is captured as an Annotated Diagram, a Prioritized Risk List, and an Action Backlog. | When two variants compete, discussions quickly decide by taste rather than effect. A/B Testing checks behavior under controlled conditions and separates real improvement from chance or expectation effects. | When demand only needs to be roughly verified, it tests interest with minimal effort. It measures whether people would take a next step at all. |
Complexitydifferent | Medium | Low | High | Low |
Timedifferent | 45-60 min | 60-90 min | 1-4 Wochen | 1-5 Tage |
Participantsdifferent | 2-8 | 4-12 | 1-6 | Nutzertraffic |
Formatdifferent | Workshop + async | Workshop | Async | Async |
Outputdifferent | Assumption map, Test backlog, Risk ranking | Annotated Diagram, Prioritized Risk List, Action Backlog | Experiment results, Decision log, Learning summary | Interest Metrics, Conversion Signal, Learning Note |
Tags1 shared | AssumptionsRiskExperimentsValidation | RiskArchitectureWorkshopValidation | ExperimentsGrowthAnalyticsValidation | ValidationExperimentsDemandGrowth |



